Ongoing Projects (Local)
- Proposed Drain and Sewer Upgrading at Woodlands Road & Woodlands Industrial Park D Street 2
Client: JTC Corporation
- Ancillary Works to Neighbourhood Renewal Programme (Batch 10) to 20 Blocks at Pasir Ris Street 52/Elias Road and Reconstruction Footbridge Across Sungei Api Api
Client: Pasir Ris-Punggol Town Council
- Demolition of Sengkang West Lift Station and Sengkang East Pumping Station
Client: Public Utilities Board (PUB)
- Proposed Erection of One Block of 5 Storey Flats (Total 19 units) at Lorong K Telok Kurau
Client: EG Properties Pte Ltd
- Harbour Drive Tunnel A&A Works
Client: SP Power Assets Limited
- Contract AM110 Design and Construction of Cycling Path Network
Client: Land Transport Authority (LTA)
- Construction of Syed Alwi Detention Tank and Ancillary Facilities
Client: Public Utilities Board (PUB)
- Improvement of PA Camp and Parbury Outlet Drains (from East Coast Parkway to the Sea)
Client: Public Utilities Board (PUB)
- Infrastructure Projects Including Road Widening at Ang Mo Kio Industrial Park 3
Client: JTC Corporation
- Contract PL203 Design & Construction of Cycling Facilities
Client: Land Transport Authority (LTA)
Completed Projects (Overseas)
-
Proposed Development Lot 4417 PT9833, Lot 4418 PT9834, Lot 4419 PT9835, Lot 4420 PT9836, Lot 4421 PT9837, Lot 4424 PT9817 Lot 4425 PT9818, Lot 4426 PT9819, Lot 4427 PT9820, Lot 4428 PT9821 Mukim of Binjai, Daerah Kemaman, Terengganu, Malaysia
Client: JV with Tepar Murni Sdn Bhd
2021-2023 Completed Projects
- Woodlands Health Campus – External Works (Inside Boundary)
Client: SDK Consortium
- Improvement to Roadside Drains and Watermain Replacement Works Under Estate Upgrading Programme Batch 9 – Contract 6 (Happy Gardens Estate)
Client: Public Utilities Board (PUB)
- Improvement to Roadside Drains V Contract C4 (Thomson Road, Langsat Road, Sennett Estate and Kampong Ampat Areas)
Client: Public Utilities Board (PUB)
- Removal of Decommissioned Transmission Cable Bridge at Merdeka Bridge
Client: SP Powerassets Limited
2020-2021 Completed Projects
- Improvement to Mountbatten Road Outlet Drain (Between Stadium Boulevard and Geylang River)
Client: Public Utilities Board (PUB)
- Removal of Decommissioned Transmission Cablebridges
Client: SP PowerAssets Limited
- Improvement to Alexandra Canal Subsidiary Drain "A" (Between Alexandra Road and Alexandra Canal)
Client: Public Utilities Board (PUB)
2019-2020 Completed Projects
- Contract RD320 Expansion of Yio Chu Kang Bus Interchange (Design and Build)
Client: Land Transport Authority (LTA)
2018-2019 Completed Projects
- Improvement To Roadside Drain V - Contract C3 (Potong Pasir Avenue 3, Meyer Road, Yio Chu Kang Road And Kheam Hock Road Areas)
Client: Public Utilities Board (PUB)
- Proposed Additions & Alterations to Existing 4-Storey Church on Lot 01449W MK19 at Yishun Street 22
Client: Church of Our Lady Star of the Sea
2017-2018 Completed Projects
- Construction Of Roads And Drain Works At Woodlands Avenue 12 And Associated Sewer Works
Client: JTC Corporation
- Water Reclamation Plant Phase 2 Contract C21B – Civil & Structural, Mechanical & Electrical Works for Wet Weather Facility
Client: Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd.
- Completion Contract For The Redevelopment Of Changi Prison Complex (Prison Headquarters)
Client: Joint Venture with Precise Development Pte. Ltd.
- (A) Widening of Sembawang Crescent and Reconstruction of Outlet Drain
Client: Housing & Development Board (HDB)
(B) Reconstruction of Trunk Sewers Adjacent to Sembawang Crescent
Client: Housing & Development Board (HDB)
- Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport – Perimeter Road and Drainage Works
Client: Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd
2016-2017 Completed Projects
- Purging of Digesters and Cleaning of Primary Sedimentation Tanks at Kranji Water Reclamation Plant
Client: Public Utilities Board (PUB)
- Improvement to Roadside Drains EUP Batch 8 Contract 6
Limau Estate (Eastern Sector)
Client: Public Utilities Board (PUB)
- Improvement to Roadside Drains EUP Batch 8 Contract 5
Limau Estate (Western Sector)
Client: Public Utilities Board (PUB)
- Extension of Sengkang West Way (Between Jalan Kayu and Sengkang West Road)
Client: Land Transport Authority (LTA)
- Improvement to Roadside Drains at River Valley Road/Oxley Road, Clementi Road/Clementi Avenue 2, Ettrick Terrace/Burnfoot Terrace/East Coast Road
and King'S Road
Client: Public Utilities Board (PUB)
-
Part A : Construction of Bus Bays and Bus Shelters in Sembawang Town
Part B : Construction of Bus Bays and Bus Shelters in Bukit Panjang Town
Part C : Road Repair & Resurfacing at Lorong 4 Toa Payoh
Part D: Road Repair & Resurfacing and Desilting of Outlet Drain along Canberra Drive and Canberra Lane
Client: Housing & Development Board (HDB)
- Second Changi NEWater Building Works – Completion of Construction & Earthworks of Area 1, 2, 3, Road Drainage, Cable Ducts, Constructing of Staircase and Telephone Cable Ducts
Client: UES Holding Pte Ltd
- Second Changi NEWater Building Works - Construction of Electric Generator Set Plinth, Fuel Tank Shelter and Generator Switch Room At Area 3
Client: UES Holding Pte Ltd
- Second Changi Newwater Plant: Design, Build, Own, Operate
Complete Construction of Control and Electrical Building RC Structures and Architectural Works (Area 2)
Client: UES Holdings Pte Ltd
- Second Changi Newwater Plant: Design, Build, Own, Operate
Complete Construction of Pumping Station and 22KV Sub-Station RC Structures and Architectural Works (Area 3)
Client: UES Holdings Pte Ltd
2015-2016 Completed Projects
-
Proposed Construction of Roads, Drains and Sewers Works at
Tampines Ave 10/Tampines North
Client: JTC Corporation
-
Construction of community and sports park at Yishun Central
Client: Nee Soon Town Council
- Improvement to Roadside Drains EUP Batch 7
Contract 5-Beng Wan, Moonstone Lane and St. Michael's Estates
Client: Public Utilities Board (PUB)
2014-2015 Completed Projects
- Second Changi NEWater plant: Construction of area 3 NEWater base slab/raft foundation including earthworks
Client: UES Holdings Pte Ltd.
Contract Period: 28 March 2015 to 16 July 2015
- ABC Waters Project at Siglap Canal
Client: Public Utilities Board (PUB)
Contract Period: 23 Sept 2013 to 22 Jul 2015
- Amendment to approved proposed erection of 5-storey mixed commercial & residential development (58 units) with basement, ATTIC & Swimming Pool including Addition & Atterations to existing 2 storey conservation shophouse on Lot 5403V MK25 at 1 Lorong 22 Geylang. (Geylang Planning Area)
Client: Grandview (Geylang) Pte Ltd
Contract Period: 14 Jul 2011 to 11 August 2015
2012-2013 Completed Projects
-
Building Work at Sengkang Neighbourhood 3 Contract 20-Blk 330A (RC Structural)
Client: Cheng Yi
Contract Period: 1 Nov 2012 to 1 Oct 2013
-
Contract Er408 - Proposed Enhancement at Junction Of Upper Serangoon Road/ Serangoon Ave 2, Serangoon Ave 2/3 And Serangoon North Ave 1/ Yio Chu Kang Road
Client: Land Transport Authority (LTA)
Contract Period: 7 May 2012 to 6 Aug 2013
- Proposed Additions & Alteration Involving Change Of Use Of Existing 1st Storey Store & Toilet To Ancillary Worker's Dormitory (12 Workers) and addition of a 2nd storey mezzanine to an existing 2 storey debached factory on LOT 02602N MK 13 at 20 Senoko South Road, Singapore 758087 (Sembawang Planning Area)
Client: Seng Huat Coffee Pte Ltd
Contract Period: 8 Oct 2012 to 7 Mar 2013
-
Part A : Construction of 21.4m Wide Road On Lot 16901A MK 18 Off Bishan ST 14
Part B : Diversion Of Sewer Line On Lot 16901A MK 18 Off Bishan ST 14
Part C : Repair and Resurfacing Works at Choa Chu Kang Grove
Client: Housing & Development Board (HDB)
Contract Period: 26 Oct 2011 to 25 Jan 2013
2011-2012 Completed Projects
-
Office Renovation Works at Springleaf Tower
Client: Home and Graden Pte Ltd
Contract Period: 24 January 2011 to 23 March 2011
-
Proposed Erection of A 4-Storey Singel-User Industrial Development (Business 2) on Lots 02291T,2316A PT & 04252K Mukim 06 At Tukang Innovation Drive - External Works
Client: BHCC Construction Pte Ltd
Contract Period: 1 September 2011 to 31 December 2011
-
Part A: Reconstruction of Roadside Drain at Pasir Ris Dr 8/ Tpe and Construction of Outlet Drain at Tpe /Pasir Ris St 51
Part B: Repair of Existing Roads and Other Civil Engineering Works within HDB Estates (North Eastern Sector)
Client: Housing & Development Board (HDB)
Contract Period: 3 January 2011 to 2 March 2012
-
Proposed Upgrading to the Existing Sump and Drain for Changi Prison Complex at Upper Changi Road North
Client: Singapore Prison Service
Contract Period: 10 November 2011 to 09 February 2012
-
Construction of Civil Engineering Works at Bukit Merah Redevelopment HDB C40
Client: Ho Lee Construction Pte Ltd
Contract Period: 1 November 2008 to 30 September 2012
-
Project Development of Changi Prison Complex Construction of an Institution Block & Ancillary Building for Changi Prison Complex-Earthworks and External Woks
Client: Sembcorp Design & Construction Pte Ltd
Contract Period: 12 October 2011 to 30 May 2013
-
Commercial School at Cityvibe : Structural and M&E Works
Client: Grandview (Geylang) Pte Ltd
Contract Period: 15 December 2011 to 15 September 2012
2010-2011 Completed Projects
-
Proposed Construction of Wetland at Grove Drive
Client: Public Utilities Board (PUB)
Contract Period: 25 Jan 2010 to 4 June 2010
-
Construction of Civil Engineering Works at Kallang Whampoa Redevelopment Contract 31
Client: Ho Lee Construction Pte Ltd
Contract Period: 17 December 2007 to 25 June 2010
-
Supply and Installation of Architectural Illumination System (Led Lightings with Audio System) to Woodlands N6 Neighbourhood Park Woodlands Drive 62/73 for Sembawang Town Council
Client: Sembawang Town Council
Contract Period: 20 July 2010 to 1 November 2010
-
Proposed External Works With A Single Storey Training Shed, Toilet Facilities And Road Works For Changi Prisons Complex On Lot No. 4405a Pt (Sl), Mukim 31 At Changi North Way
Client: Chan & Chan Engineering Pte Ltd
Contract Period: 13 Oct 2009 to 29 March 2010
-
Construction of Multi-Purpose Game Courts with Fencing, Sheltered Linkway from Contingency Field to Sh 2/ Transit Centre & Electrical Works
Client: Chan & Chan Engineering Pte Ltd
Contract Period: 25 June 2010 to 24 November 2010
-
Construction of RC Structural Works at 43 Tech Park Crescent
Client: Hua Ying Seng Construction Pte Ltd
Contract Period: 5 July 2010 to 20 December 2010
-
Construction of Civil Engineering Works at Yishun Neighbourhood 4 Contract 6
Client: Ho Lee Construction Pte Ltd
Contract Period: 15 June 2010 to 15 February 2011
-
Proposed New Covered Linkway from Cluster B to Block 3 Transit Centre on Lot 04405A (PT) MK 31 at Changi North Way
Client: Singapore Prison Service
Contract Period: 9 September 2010 to 8 February 2011
-
Renovation Works at 43 Wak Hassan Dr
Client: Wilson Tan
Contract Period: 20 November 2010 to 20 December 2010
-
Construction of Road Linking Kim Tim Road and Moh Guan Terrace
Client: Housing & Development Board (HDB)
Contract Period: 28 September 2010 to 08 December 2011
-
Widening of Bedok Reservoir Crescent
Client: Housing & Development Board (HDB)
Contract Period: 30 December 2010 to 06 December 2011
2009-2010 Completed Projects
-
Proposed Erection of One Steel Structure Warehouse at Jln Ampas
Client: Griffin Kinetic Pte Ltd
Contract Period: 16 March 2009 to 15 April 2009
-
Proposed New Erection of One Block of 2-Storey Engine Overhaul Building To The Existing Trent Engine Overhaul Complex On Lot 4417P MK 31 At Loyang Way External Works
Client: BHCC Construction Pte Ltd
Contract Period: 5 January 2009 to 30 May 2009
-
Supply, Fabricate and Delivery of structural steel work to NY-03 (Front Portion) Main Frame for Universal Studio Singapore New York Street Project
Client: Tong Sheng Construction & Trading Pte Ltd
Contract Period: 3 November 2009 to 17 November 2009
-
Proposed Additions and Alterations to the Existing Factory on Lot 935 MK06 at 36A Quality Road, Singapore
Client: Star Chemical Manufacturers Pte Ltd
Contract Period: 1 June 2009 to 31 December 2009
-
Construction of 4 Covered Walkways at Blks 324/325, 334/334A, 341/341A, 478/ Bus-Stop & Drop-Off Porch at Blk 280, 1 Jogging Track & 2 Pavillions at Blks 278/ 282 in Canberra Division (Contract Ref: AA-09-019-SB)
Client: Sembawang Town Council
Contract Period: 1 June 2009 to 28 February 2010
2008-2009 Completed Projects
-
Renovation & Repairing Works for Griffin Kinetic Pte Ltd Office & Warehouse
Client: Griffin Kinetic Pte Ltd
Contract Period: 13 May 2008 to 12 June 2008
-
Resurfacing of Existing Driveway (Block No 2) and Ancillary Works at Lakepoint Condominium
Client: MCSTP No. 885
Contract Period: 28 July 2008 to 8 August 2008
-
Renovation Works at Emerald Warehouse at Jalan Ampas
Client: Griffin Kinetic Pte Ltd
Contract Period: 11 November 2008 to 30 December 2008
-
Proposed Erection of 2-Storey Single User Industrial Development at Changi North Rise for ASC External Works
Client: BHCC Construction Pte Ltd
Contract Period: 10 September 2008 to 30 November 2008
-
Demolition & Construction of Shunt Reactors Plinths for The Proposed Upgrading of 5 Nos of 230kV/ 100MVAr & 50MVAr Shunt Reactors at Senoko Power Station and Ayeh Rajah Substation (SP Powerassets Contract No.: 9070122)
Client: Tong Guan Resources Pte Ltd
Contract Period: 12 February 2008 to 11 December 2008
-
Supply of Labour to Dismantle & Reinstall the UPVC Rain Water Down Pipes at Showa Denko HD Singapore
Client: Takenaka Corporation
Contract Period: 10 November 2007 to 30 November 2008
2007-2008 Completed Projects
- Reconstruction of No.75 Springleaf Garden The scope of works involved demolition of the existing double storey semi-detached house and reconstruct two units of 3 storey semi-detached house.
Client: Acecon Engineering Pte Ltd
Contract Period: 20 September 2007 to 31 August 2008
-
External Works for Emerald Warehouse at Jalan Ampas. The scope of works involved reconstruction of 230mm wide drain and re-surfacing the premix access.
Client: Griffin Kinetic Pte Ltd
Contract Period: 25 October 2007 to 24 November 2007
-
New Beam Support for Es-Guard Cladding at Showa Denko HD Singapore. The scope of works involved construction of a beam along the perimeter of the building to support a cladding.
Client: Takenaka Corporation Pte Ltd
Contract Period: 1 November to 31 December 2007
-
Proposed Additions & Alterations to existing 3 units of 2-storey shophouses at No. 56, 58 & 60 at Lorong 25A Geylang
Client: Grandview (Geylang) Pte Ltd
Contract Period: 16 November 2007 to 31 January 2008
-
Proposed Additions & Alterations to Existing 3-Storey Intermediate Terrace Dwelling Houses at Unit 13 & 15 Kang Choo Bin Walk
Client: Mr Low Ming Peow & Mr Chee Han Sing
Contract Period: 10 March 2008 to 9 June 2008
-
Proposed Demolition of Existing Single Storey Building for BLK 227A, 529, 559, 960, 960A, 961, 962, 1009, 1010, 1061 & 1148 In Seletar West Camp
Client: Ban & Company
Contract Period: 5 December 2007 to 31 January 2008