PROJECTS

Ongoing Projects (Local)

  1. Design & Construction of Cycling Facilities

    Client: Land Transport Authority (LTA)


  2. Improvement to Mountbatten Road Outlet Drain (Between Stadium Boulevard and Geylang River)

    Client: Public Utilities Board (PUB)


  3. Removal of Decommissioned Transmission Cable Bridges

    Client: SP PowerAssets Limited


  4. Improvement to Raodside Drains V - Contract C4 (Thomson Road, Langsat Road, Sennett Estate and Kampong Ampat Areas)

    Client: Public Utilities Board (PUB)


  5. Improvement to Alexandra Canal Subsidiary Drain A (Between Alexandra Road and Alexandra Canal)

    Client: Public Utilities Board (PUB)


  6. Expansion of Yio Chu Kang Bus Interchange

    Client: Land Transport Authority (LTA)


  7. Proposed Additions & Alterations to Existing 4-Storey Church on Lot 01449W MK19 at Yishun Street 22

    Client: Church of Our Lady Star of the Sea


  8. Improvement To Roadside Drain V - Contract C3 (Potong Pasir Avenue 3, Meyer Road, Yio Chu Kang Road And Kheam Hock Road Areas)

    Client: Public Utilities Board (PUB)


Completed Projects (Overseas)

  1. Commercial Development of 9 Commercial Shop Houses

    Location: Kemaman District/ State of Terengganu, Malaysia
    Date of Completion: December 2018



2017-2018 Completed Projects

  1. Construction Of Roads And Drain Works At Woodlands Avenue 12 And Associated Sewer Works

    Client: JTC Corporation


  2. Phase II Expansion Changi Water Reclamation Plant Wet Weather Facility

    Client: Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd.


  3. Completion Contract For The Redevelopment Of Changi Prison Complex (Prison Headquarters)

    Client: Joint Venture with Precise Development Pte. Ltd.


  4. (A) Widening of Sembawang Crescent and Reconstruction of Outlet Drain
    (B) Reconstruction of Trunk Sewers Adjacent to Sembawang Crescent

    Client: Housing & Development Board (HDB)


  5. Proposed Development of Changi East to Effect 3 Runway Operations at Singapore Changi Airport Perimeter Road and Drainage Works

    Client: Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd


  6. Completion Contract For The Redevelopment Of Changi Prison Complex (Prison Headquarters)- Labour Supply For External Works

    Client: Precise Development Pte. Ltd.


2016-2017 Completed Projects

  1. Purging of Digesters and Cleaning of Primary Sedimentation Tanks at Kranji Water Reclamation Plant

    Client: Public Utilities Board (PUB)


  2. Improvement to Roadside Drains EUP Batch 8 Contract 6
    Limau Estate (Eastern Sector)

    Client: Public Utilities Board (PUB)


  3. Improvement to Roadside Drains EUP Batch 8 Contract 5
    Limau Estate (Western Sector)

    Client: Public Utilities Board (PUB)


  4. Extension of Sengkang West Way (Between Jalan Kayu and Sengkang West Road)

    Client: Land Transport Authority (LTA)


  5. Improvement to Roadside Drains at River Valley Road/Oxley Road, Clementi Road/Clementi Avenue 2, Ettrick Terrace/Burnfoot Terrace/East Coast Road
    and King'S Road

    Client: Public Utilities Board (PUB)


  6. Part A : Construction of Bus Bays and Bus Shelters in Sembawang Town
    Part B : Construction of Bus Bays and Bus Shelters in Bukit Panjang Town
    Part C : Road Repair & Resurfacing at Lorong 4 Toa Payoh
    Part D: Road Repair & Resurfacing and Desilting of Outlet Drain along Canberra Drive and Canberra Lane

    Client: Housing & Development Board (HDB)


  7. Second Changi NEWater Building Works Completion of Construction & Earthworks of Area 1, 2, 3, Road Drainage, Cable Ducts, Constructing of Staircase and Telephone Cable Ducts

    Client: UES Holding Pte Ltd


  8. Second Changi NEWater Building Works - Construction of Electric Generator Set Plinth, Fuel Tank Shelter and Generator Switch Room At Area 3

    Client: UES Holding Pte Ltd


  9. Second Changi Newwater Plant: Design, Build, Own, Operate
    Complete Construction of Control and Electrical Building RC Structures and Architectural Works (Area 2)

    Client: UES Holdings Pte Ltd


  10. Second Changi Newwater Plant: Design, Build, Own, Operate
    Complete Construction of Pumping Station and 22KV Sub-Station RC Structures and Architectural Works (Area 3)

    Client: UES Holdings Pte Ltd


2015-2016 Completed Projects

  1. Proposed Construction of Roads, Drains and Sewers Works at
    Tampines Ave 10/Tampines North

    Client: JTC Corporation


  2. Construction of community and sports park at Yishun Central

    Client: Nee Soon Town Council


  3. Improvement to Roadside Drains EUP Batch 7
    Contract 5-Beng Wan, Moonstone Lane and St. Michael's Estates

    Client: Public Utilities Board (PUB)


2014-2015 Completed Projects

  1. Second Changi NEWater plant: Construction of area 3 NEWater base slab/raft foundation including earthworks

    Client: UES Holdings Pte Ltd.
    Contract Period: 28 March 2015 to 16 July 2015



  2. ABC Waters Project at Siglap Canal

    Client: Public Utilities Board (PUB)
    Contract Period: 23 Sept 2013 to 22 Jul 2015



  3. Amendment to approved proposed erection of 5-storey mixed commercial & residential development (58 units) with basement, ATTIC & Swimming Pool including Addition & Atterations to existing 2 storey conservation shophouse on Lot 5403V MK25 at 1 Lorong 22 Geylang. (Geylang Planning Area)

    Client: Grandview (Geylang) Pte Ltd
    Contract Period: 14 Jul 2011 to 11 August 2015



2013-2014 Completed Projects

  1. Proposed Membrane Plant at Changi Water Reclamation Plant

    Client: UES Holdings Pte Ltd
    Contract Period: Oct 2013 to Oct 2014



  2. Proposed Expansion To Digesters & Effluent Pumping Station At CWRP, Singapore
    Provide Structural and Architectural Works For Digester 6 & Effluent Pumping Station

    Client: UES Holdings Pte Ltd
    Contract Period: 23 Feb 2012 to 31 Dec 2014



  3. Proposed Water Life Station At Jurong Water Reclamation Plant

    Client: UES Holdings Pte Ltd
    Contract Period: Oct 2013 to Dec 2013



  4. Temporary External Works at Changi Prison Complex at Upper Changi Road North

    Client: Singapore Prison Service
    Contract Period: 15 Mar 2013 to 15 Nov 2013




2012-2013 Completed Projects

  1. Building Work at Sengkang Neighbourhood 3 Contract 20-Blk 330A (RC Structural)

    Client: Cheng Yi
    Contract Period: 1 Nov 2012 to 1 Oct 2013


  2. Contract Er408 - Proposed Enhancement at Junction Of Upper Serangoon Road/ Serangoon Ave 2, Serangoon Ave 2/3 And Serangoon North Ave 1/ Yio Chu Kang Road

    Client: Land Transport Authority (LTA)
    Contract Period: 7 May 2012 to 6 Aug 2013



  3. Proposed Additions & Alteration Involving Change Of Use Of Existing 1st Storey Store & Toilet To Ancillary Worker's Dormitory (12 Workers) and addition of a 2nd storey mezzanine to an existing 2 storey debached factory on LOT 02602N MK 13 at 20 Senoko South Road, Singapore 758087 (Sembawang Planning Area)

    Client: Seng Huat Coffee Pte Ltd
    Contract Period: 8 Oct 2012 to 7 Mar 2013


  4. Part A : Construction of 21.4m Wide Road On Lot 16901A MK 18 Off Bishan ST 14
    Part B : Diversion Of Sewer Line On Lot 16901A MK 18 Off Bishan ST 14
    Part C : Repair and Resurfacing Works at Choa Chu Kang Grove

    Client: Housing & Development Board (HDB)
    Contract Period: 26 Oct 2011 to 25 Jan 2013




2011-2012 Completed Projects

  1. Office Renovation Works at Springleaf Tower

    Client: Home and Graden Pte Ltd
    Contract Period: 24 January 2011 to 23 March 2011


  2. Proposed Erection of A 4-Storey Singel-User Industrial Development (Business 2) on Lots 02291T,2316A PT & 04252K Mukim 06 At Tukang Innovation Drive - External Works

    Client: BHCC Construction Pte Ltd
    Contract Period: 1 September 2011 to 31 December 2011



  3. Part A: Reconstruction of Roadside Drain at Pasir Ris Dr 8/ Tpe and Construction of Outlet Drain at Tpe /Pasir Ris St 51

    Part B: Repair of Existing Roads and Other Civil Engineering Works within HDB Estates (North Eastern Sector)

    Client: Housing & Development Board (HDB)
    Contract Period: 3 January 2011 to 2 March 2012



  4. Proposed Upgrading to the Existing Sump and Drain for Changi Prison Complex at Upper Changi Road North

    Client: Singapore Prison Service
    Contract Period: 10 November 2011 to 09 February 2012


  5. Construction of Civil Engineering Works at Bukit Merah Redevelopment HDB C40

    Client: Ho Lee Construction Pte Ltd
    Contract Period: 1 November 2008 to 30 September 2012



  6. Project Development of Changi Prison Complex Construction of an Institution Block & Ancillary Building for Changi Prison Complex-Earthworks and External Woks

    Client: Sembcorp Design & Construction Pte Ltd
    Contract Period: 12 October 2011 to 30 May 2013


  7. Commercial School at Cityvibe : Structural and M&E Works

    Client: Grandview (Geylang) Pte Ltd
    Contract Period: 15 December 2011 to 15 September 2012


2010-2011 Completed Projects

  1. Proposed Construction of Wetland at Grove Drive

    Client: Public Utilities Board (PUB)
    Contract Period: 25 Jan 2010 to 4 June 2010



  2. Construction of Civil Engineering Works at Kallang Whampoa Redevelopment Contract 31

    Client: Ho Lee Construction Pte Ltd
    Contract Period: 17 December 2007 to 25 June 2010



  3. Supply and Installation of Architectural Illumination System (Led Lightings with Audio System) to Woodlands N6 Neighbourhood Park Woodlands Drive 62/73 for Sembawang Town Council

    Client: Sembawang Town Council
    Contract Period: 20 July 2010 to 1 November 2010



  4. Proposed External Works With A Single Storey Training Shed, Toilet Facilities And Road Works For Changi Prisons Complex On Lot No. 4405a Pt (Sl), Mukim 31 At Changi North Way

    Client: Chan & Chan Engineering Pte Ltd
    Contract Period: 13 Oct 2009 to 29 March 2010



  5. Construction of Multi-Purpose Game Courts with Fencing, Sheltered Linkway from Contingency Field to Sh 2/ Transit Centre & Electrical Works

    Client: Chan & Chan Engineering Pte Ltd
    Contract Period: 25 June 2010 to 24 November 2010



  6. Construction of RC Structural Works at 43 Tech Park Crescent

    Client: Hua Ying Seng Construction Pte Ltd
    Contract Period: 5 July 2010 to 20 December 2010



  7. Construction of Civil Engineering Works at Yishun Neighbourhood 4 Contract 6

    Client: Ho Lee Construction Pte Ltd
    Contract Period: 15 June 2010 to 15 February 2011



  8. Proposed New Covered Linkway from Cluster B to Block 3 Transit Centre on Lot 04405A (PT) MK 31 at Changi North Way

    Client: Singapore Prison Service
    Contract Period: 9 September 2010 to 8 February 2011



  9. Renovation Works at 43 Wak Hassan Dr

    Client: Wilson Tan
    Contract Period: 20 November 2010 to 20 December 2010


  10. Construction of Road Linking Kim Tim Road and Moh Guan Terrace

    Client: Housing & Development Board (HDB)
    Contract Period: 28 September 2010 to 08 December 2011



  11. Widening of Bedok Reservoir Crescent

    Client: Housing & Development Board (HDB)
    Contract Period: 30 December 2010 to 06 December 2011



2009-2010 Completed Projects

  1. Proposed Erection of One Steel Structure Warehouse at Jln Ampas

    Client: Griffin Kinetic Pte Ltd
    Contract Period: 16 March 2009 to 15 April 2009


  2. Proposed New Erection of One Block of 2-Storey Engine Overhaul Building To The Existing Trent Engine Overhaul Complex On Lot 4417P MK 31 At Loyang Way External Works

    Client: BHCC Construction Pte Ltd
    Contract Period: 5 January 2009 to 30 May 2009



  3. Supply, Fabricate and Delivery of structural steel work to NY-03 (Front Portion) Main Frame for Universal Studio Singapore New York Street Project

    Client: Tong Sheng Construction & Trading Pte Ltd
    Contract Period: 3 November 2009 to 17 November 2009


  4. Proposed Additions and Alterations to the Existing Factory on Lot 935 MK06 at 36A Quality Road, Singapore

    Client: Star Chemical Manufacturers Pte Ltd
    Contract Period: 1 June 2009 to 31 December 2009




  5. Construction of 4 Covered Walkways at Blks 324/325, 334/334A, 341/341A, 478/ Bus-Stop & Drop-Off Porch at Blk 280, 1 Jogging Track & 2 Pavillions at Blks 278/ 282 in Canberra Division (Contract Ref: AA-09-019-SB)

    Client: Sembawang Town Council
    Contract Period: 1 June 2009 to 28 February 2010



2008-2009 Completed Projects

  1. Renovation & Repairing Works for Griffin Kinetic Pte Ltd Office & Warehouse

    Client: Griffin Kinetic Pte Ltd
    Contract Period: 13 May 2008 to 12 June 2008


  2. Resurfacing of Existing Driveway (Block No 2) and Ancillary Works at Lakepoint Condominium

    Client: MCSTP No. 885
    Contract Period: 28 July 2008 to 8 August 2008



  3. Renovation Works at Emerald Warehouse at Jalan Ampas

    Client: Griffin Kinetic Pte Ltd
    Contract Period: 11 November 2008 to 30 December 2008


  4. Proposed Erection of 2-Storey Single User Industrial Development at Changi North Rise for ASC External Works

    Client: BHCC Construction Pte Ltd
    Contract Period: 10 September 2008 to 30 November 2008



  5. Demolition & Construction of Shunt Reactors Plinths for The Proposed Upgrading of 5 Nos of 230kV/ 100MVAr & 50MVAr Shunt Reactors at Senoko Power Station and Ayeh Rajah Substation (SP Powerassets Contract No.: 9070122)

    Client: Tong Guan Resources Pte Ltd
    Contract Period: 12 February 2008 to 11 December 2008


  6. Supply of Labour to Dismantle & Reinstall the UPVC Rain Water Down Pipes at Showa Denko HD Singapore

    Client: Takenaka Corporation
    Contract Period: 10 November 2007 to 30 November 2008


2007-2008 Completed Projects

  1. Reconstruction of No.75 Springleaf Garden The scope of works involved demolition of the existing double storey semi-detached house and reconstruct two units of 3 storey semi-detached house.

    Client: Acecon Engineering Pte Ltd
    Contract Period: 20 September 2007 to 31 August 2008



  2. External Works for Emerald Warehouse at Jalan Ampas. The scope of works involved reconstruction of 230mm wide drain and re-surfacing the premix access.

    Client: Griffin Kinetic Pte Ltd
    Contract Period: 25 October 2007 to 24 November 2007


  3. New Beam Support for Es-Guard Cladding at Showa Denko HD Singapore. The scope of works involved construction of a beam along the perimeter of the building to support a cladding.

    Client: Takenaka Corporation Pte Ltd
    Contract Period: 1 November to 31 December 2007


  4. Proposed Additions & Alterations to existing 3 units of 2-storey shophouses at No. 56, 58 & 60 at Lorong 25A Geylang

    Client: Grandview (Geylang) Pte Ltd
    Contract Period: 16 November 2007 to 31 January 2008



  5. Proposed Additions & Alterations to Existing 3-Storey Intermediate Terrace Dwelling Houses at Unit 13 & 15 Kang Choo Bin Walk

    Client: Mr Low Ming Peow & Mr Chee Han Sing
    Contract Period: 10 March 2008 to 9 June 2008



  6. Proposed Demolition of Existing Single Storey Building for BLK 227A, 529, 559, 960, 960A, 961, 962, 1009, 1010, 1061 & 1148 In Seletar West Camp

    Client: Ban & Company
    Contract Period: 5 December 2007 to 31 January 2008